The Shard

Shard & City Hall - iStock_27202549_XXLARGE - Copy.jpg

IC Service & Maintenance Ltd were chosen to carry out the works for the Base Build of The Shard.

 
 

With 3 basements, Ground floor and 87 floors of space, the fire detection within the Shard is the highest in Western Europe. Whilst this meant that significant issues had to be overcome in the installation from the logistics of moving equipment, materials and plant, to ensuring that operatives safety was maintained through-out the works, we are pleased to be associated with the following services:

  • Fire

  • PAVA

  • Fire Telephone/Disabled Refuge and Disabled Toilet Alarms

  • Damper Decoder System

  • Graphics systems for all the above

 

IC Service & Maintenance Ltd are also pleased to be have been awarded the Fit Out Contracts for:

  • The Office Group

  • Heinz

  • Sage

  • Tiffany

  • Matches Fashion

  • HCA Healthcare

  • and many more

the shard.jpg

We have recently been awarded the extension of the Landlords Maintenance Contract for the Fire, PAVA and Fire Telephone/ Disabled Refuge and Disabled Toilet Alarms, providing coverage 7 days a week with a permanent engineer based on site. Currently there are 90 Advanced Fire Alarm Panels on the Shard and 56 Baldwin Boxall PAVA racks.